论文部分内容阅读
黑龙港电站是湖北省通山县水电公司直管的引水式径流电站,装机1×800千瓦,设计年保证出力260千瓦,设计年利用率3500小时,设计年发电量264万千瓦小时。在1986~1987两年内,县公司对该站以“六定”(定人员、定产值、定产量、定利润、定岗位责任、定设备完好率)、“两奖”(超产奖、安全无事故奖)和“一挂钩”(电站费用同上网
The Heilonggang Power Station is a direct-flow runoff power station directly managed by the hydropower company of Tongshan County, Hubei Province. It has an installed capacity of 1×800 kilowatts, a design annual guaranteed output of 260 kilowatts, a designed annual utilization rate of 3,500 hours, and a designed annual power generation capacity of 2.64 million kilowatt-hours. In the two years from 1986 to 1987, the county company took the “six settings” (fixed personnel, fixed output value, fixed output, fixed profit, fixed job responsibilities, fixed equipment rate) and “two awards” (super-production award, safety Accident award) and “a hook” (power plant costs with the Internet