【摘 要】 电力建设项目有着工期长、投资大的特征,会受到很多因素的影响,因此,电力工程造价的控制也是一个系统、复杂的工程,控制好电力工程的造价十分重要,对于电力工程造价的控制需要贯穿在设计、施工、竣工验收等过程中,这样才能够达到控制工程造价的作用,才能够有效的提高电力企业的经济效益与设计效益。那么应该如何科学合理的控制电力工程的造价呢?一、控制好工程设计阶段的造价;二、控制好招标与投标阶段的造价;三、控制好施工阶段的造价;四、控制好竣工阶段的造价。
【关键词】 电力工程造价;合理控制策略;分析
【Abstract】 power construction projects have a long construction period, large investment characteristics, will be affected by many factors, therefore, the complicated control of power engineering cost is a systematic, engineering, good control of electric power engineering cost is very important, for the cost control of electric power engineering needs throughout the design, construction and acceptance, in the process, so that it can achieve the control of project cost, to economic benefit and design to improve the efficiency of electric power enterprise effectively. Control of electric power engineering how to scientific and reasonable cost? One, good control of engineering design stage construction cost; two, good control of tendering and bidding phase of the cost; three, control the cost of construction stage of cost control; four, well completion phase.
【Key Words】 electric power engineering cost; control strategy; analysis
电力工程造价的控制具有系统性与复杂性的特征,其控制成效直接关乎着电力工程的施工成效,电力工程的造价与工期和质量同等重要,这三个因素是相辅相成的,只有对电力工程的施工进行全程管理,才能够达到控制造价的效果,那么应该如何科学合理的控制电力工程的造价呢?
1、控制好工程设计阶段的造价
工程设计的质量能否满足要求不仅关乎着电力工程的投资,也会影响工程的使用效果,科学合理的设计工作与先进的技术不仅可以有效缩短电力工程的工期,也可以降低投资,减轻电力企业的成本,提升电力企业的经济效益与社会效益。因此,在工程的设计阶段,必须要从经济、安全、标准与功能多个方面进行衡量,确定好最优的设计方案。此外,建设单位不能将设计工作与设计阶段的造价工作完全推给设计单位,应该积极主动的参与的设计工作中,确定好管理与控制重点,与设计单位共同设计计划,做好限额设计工作。
在电力工程的设计阶段,常常会遇到结构地质条件、形式与层数相似的情况,不同的设计人员设计的方式不同,有些设计人员设计的安全系数大大超过标准范围,这就会在一定程度上增加成本,考虑到这一因素,建设单位就需要加强与设计单位的沟通工作,提出明确的投资计划,与设计单位一起开展限额设计工作,让设计人员在注重工程功能与质量的同时注意好成本的控制工作。在设计方案完成后,建设单位就需要进行对方对比,对比的内容需要涵盖到设备选型、地基处理、平面布置、线路走径、结构形式等多个方面,在满足工程质量与安全需求的前提之下,提出相应的优化方案,尽量的降低成本。
2、控制好招标与投标阶段的造价
目前,我国电力工程的承建主要采用招标与投标制度,工程的建筑费用包括间接费用、直接费用、税金与利润,按照竞争标准,这些费用可以分为直接成本和间接成本两种,其中,直接工程费用与税金属于直接成本,其余的费用则属于间接费用的范畴。在招标与投标过程中,应该给出上限与下限,控制好招标与投标过程中的造价。
3、控制好施工阶段的造價
电力工程建设项目属于大型的项目,必然会涉及到设计的变更工作,设计变更的内容包括项目质量、项目进度与投资控制几个方面,因此,建设单位必须要做好设计变更的管理工作,防止由于设计变更为电力企业带来不必要的损失,坚决禁止私自提高建设的标准,修改建设的内容,严格的控制好额外预算费用,如无特殊情况,尽量不做变更,如果难以避免,就需要将变更工作控制在初级阶段,降低额外的预算。
此外,要注意到,对于电力工程而言,材料与设计费用占据着很高的比例,因此,要做好材料的采购、设备的管理与资金的使用工作,对于物资与材料的采购应该充分的发挥出渠道作用,尽量的减少中间的环节,降低物资与材料的购买价格。在施工过程中,应该科学的安排施工进度,确定好施工时间与施工顺序,加强对各项资金的支付管理工作,有计划的购买物资和材料,减少施工阶段由于筹集资金而发生的利息。同时,还要做好现场的签证管理工作,严格的把握好签证的质量关,避免出现虚假签证与不实签证的情况,防止由于签证问题导致工程造价升高。
4、控制好竣工阶段的造价
竣工阶段的造价就是根据电力工程建设过程中的资料对实际投资进行汇总的一项工作,涉及的费用包括管理费用、设备材料费用、财务费用、建安费用、其他费用几个方面,对这几类费用进行科学的汇总能够真实有效的反应出工程的投资效果与实际的造价。因此,技经人员应该根据现场施工情况对工程的价款进行科学的审核与阶段,防止结算漏洞的出现。此外,还要加强对现场技术管理人员的培训工作,防止不合理费用的产生,从而起到降低工程造价的作用。在这一过程中,应该将重点放在材料用量与差价的审核工作上,严格的按照国家安装工程材料定额消耗标准、建筑标准、市场情况与招标文件确定好材料的价差。
5、结束语
总而言之,电力建设项目有着工期长、投资大的特征,会受到很多因素的影响,因此,电力工程造价的控制也是一个系统、复杂的工程,对于电力工程造价的控制需要贯穿在设计、施工、竣工验收等过程中,这样才能够达到控制工程造价的作用,才能够有效的提高电力企业的经济效益与设计效益。在这一过程中,建设单位应该积极的参与到决策、设计、实施与结算的各个环节之中,对造价进行科学合理的控制,促进电力企业商业化的良性发展。
参考文献:
[1]王锐,黄利民.浅谈电力工程造价的合理控制[J].中小企业管理与科技(下旬刊),2011(01)
[2]范婷,李宏玲.论输变电工程造价的合理控制[J].黑龙江科技信息,2012(17)
[3]叶志东,谢鹏林,王星箫.浅谈输变电工程造价的管理与合理控制[J].财经界(学术版),2008(02)
[4]李泓泽,郎斌.全寿命周期造价管理在电力工程造价管理中的应用研究[J].华北电力大学学报(社会科学版),2008(01)
【关键词】 电力工程造价;合理控制策略;分析
【Abstract】 power construction projects have a long construction period, large investment characteristics, will be affected by many factors, therefore, the complicated control of power engineering cost is a systematic, engineering, good control of electric power engineering cost is very important, for the cost control of electric power engineering needs throughout the design, construction and acceptance, in the process, so that it can achieve the control of project cost, to economic benefit and design to improve the efficiency of electric power enterprise effectively. Control of electric power engineering how to scientific and reasonable cost? One, good control of engineering design stage construction cost; two, good control of tendering and bidding phase of the cost; three, control the cost of construction stage of cost control; four, well completion phase.
【Key Words】 electric power engineering cost; control strategy; analysis
电力工程造价的控制具有系统性与复杂性的特征,其控制成效直接关乎着电力工程的施工成效,电力工程的造价与工期和质量同等重要,这三个因素是相辅相成的,只有对电力工程的施工进行全程管理,才能够达到控制造价的效果,那么应该如何科学合理的控制电力工程的造价呢?
1、控制好工程设计阶段的造价
工程设计的质量能否满足要求不仅关乎着电力工程的投资,也会影响工程的使用效果,科学合理的设计工作与先进的技术不仅可以有效缩短电力工程的工期,也可以降低投资,减轻电力企业的成本,提升电力企业的经济效益与社会效益。因此,在工程的设计阶段,必须要从经济、安全、标准与功能多个方面进行衡量,确定好最优的设计方案。此外,建设单位不能将设计工作与设计阶段的造价工作完全推给设计单位,应该积极主动的参与的设计工作中,确定好管理与控制重点,与设计单位共同设计计划,做好限额设计工作。
在电力工程的设计阶段,常常会遇到结构地质条件、形式与层数相似的情况,不同的设计人员设计的方式不同,有些设计人员设计的安全系数大大超过标准范围,这就会在一定程度上增加成本,考虑到这一因素,建设单位就需要加强与设计单位的沟通工作,提出明确的投资计划,与设计单位一起开展限额设计工作,让设计人员在注重工程功能与质量的同时注意好成本的控制工作。在设计方案完成后,建设单位就需要进行对方对比,对比的内容需要涵盖到设备选型、地基处理、平面布置、线路走径、结构形式等多个方面,在满足工程质量与安全需求的前提之下,提出相应的优化方案,尽量的降低成本。
2、控制好招标与投标阶段的造价
目前,我国电力工程的承建主要采用招标与投标制度,工程的建筑费用包括间接费用、直接费用、税金与利润,按照竞争标准,这些费用可以分为直接成本和间接成本两种,其中,直接工程费用与税金属于直接成本,其余的费用则属于间接费用的范畴。在招标与投标过程中,应该给出上限与下限,控制好招标与投标过程中的造价。
3、控制好施工阶段的造價
电力工程建设项目属于大型的项目,必然会涉及到设计的变更工作,设计变更的内容包括项目质量、项目进度与投资控制几个方面,因此,建设单位必须要做好设计变更的管理工作,防止由于设计变更为电力企业带来不必要的损失,坚决禁止私自提高建设的标准,修改建设的内容,严格的控制好额外预算费用,如无特殊情况,尽量不做变更,如果难以避免,就需要将变更工作控制在初级阶段,降低额外的预算。
此外,要注意到,对于电力工程而言,材料与设计费用占据着很高的比例,因此,要做好材料的采购、设备的管理与资金的使用工作,对于物资与材料的采购应该充分的发挥出渠道作用,尽量的减少中间的环节,降低物资与材料的购买价格。在施工过程中,应该科学的安排施工进度,确定好施工时间与施工顺序,加强对各项资金的支付管理工作,有计划的购买物资和材料,减少施工阶段由于筹集资金而发生的利息。同时,还要做好现场的签证管理工作,严格的把握好签证的质量关,避免出现虚假签证与不实签证的情况,防止由于签证问题导致工程造价升高。
4、控制好竣工阶段的造价
竣工阶段的造价就是根据电力工程建设过程中的资料对实际投资进行汇总的一项工作,涉及的费用包括管理费用、设备材料费用、财务费用、建安费用、其他费用几个方面,对这几类费用进行科学的汇总能够真实有效的反应出工程的投资效果与实际的造价。因此,技经人员应该根据现场施工情况对工程的价款进行科学的审核与阶段,防止结算漏洞的出现。此外,还要加强对现场技术管理人员的培训工作,防止不合理费用的产生,从而起到降低工程造价的作用。在这一过程中,应该将重点放在材料用量与差价的审核工作上,严格的按照国家安装工程材料定额消耗标准、建筑标准、市场情况与招标文件确定好材料的价差。
5、结束语
总而言之,电力建设项目有着工期长、投资大的特征,会受到很多因素的影响,因此,电力工程造价的控制也是一个系统、复杂的工程,对于电力工程造价的控制需要贯穿在设计、施工、竣工验收等过程中,这样才能够达到控制工程造价的作用,才能够有效的提高电力企业的经济效益与设计效益。在这一过程中,建设单位应该积极的参与到决策、设计、实施与结算的各个环节之中,对造价进行科学合理的控制,促进电力企业商业化的良性发展。
参考文献:
[1]王锐,黄利民.浅谈电力工程造价的合理控制[J].中小企业管理与科技(下旬刊),2011(01)
[2]范婷,李宏玲.论输变电工程造价的合理控制[J].黑龙江科技信息,2012(17)
[3]叶志东,谢鹏林,王星箫.浅谈输变电工程造价的管理与合理控制[J].财经界(学术版),2008(02)
[4]李泓泽,郎斌.全寿命周期造价管理在电力工程造价管理中的应用研究[J].华北电力大学学报(社会科学版),2008(01)