大伙房水库输水洞改造工程是大伙房水库1958年8月竣工以来,首次对输水洞进行改造。输水洞位于大伙房水库主坝和一副坝之间的主坝左侧,主要功能就是排泄洪水、引水发电、灌溉和先期施工导流,输水洞主要由进水渠、进口控制段、主洞段、支洞1和支洞2,还有就是位于大伙房水库正门内的水库景观建筑的开闭室等部分组成。
Dahuofang Reservoir Water Tunnel Reconstruction Project is Dahuofang Reservoir completed in August 1958, the first transformation of the water tunnel. The water hole is located on the left side of the main dam between the main dam and a dam in the Dahuofang Reservoir. The main functions are drainage of floodwater, diversion and power generation, irrigation and pre-construction diversion. The water diversion tunnel is mainly composed of intake channels, inlet control sections, Section of the hole, branch hole 1 and branch hole 2, and there is the opening and closing room of the reservoir landscape architecture located in the main entrance of the Dahuofang Reservoir.