论文部分内容阅读
近日,水利部、国家能源局以水移[2013]84号文件联合印发了《大中型水利枢纽和水电工程移民统计管理暂行办法》(以下简称《统计办法》),自印发之日起施行。
Recently, the Ministry of Water Resources and the National Energy Administration jointly issued the Provisional Measures for the Administration of Migration Statistics of Large and Medium-sized Hydropower Projects and Hydropower Projects (hereinafter referred to as the “Measures for Statistics”) with the No.2084 [1984] document issued by the Ministry of Water Resources [2008].