论文部分内容阅读
随着投资体制的改革,项目法人制的深化,为了加强项目管理,提高资金运作效益,将工程投资控制在批准的总概算内,对建设项目实施投资监理是监理模式的一种新探索,并得到越来越多的投资主体的重视与欢迎。我们运用建行长期积累的项目管理经验和优势参与了上海市轨道交通明珠线一期工程的投资监理工作。该工程是全国第一条高架轨道交通线,上海市重大公共交通基础设施项目。线路全长24.97公里,其中高架线路21.51公里,地面线路3.46公里;沿线共设19座车站,其中16座为高架车站。一期工程初步设计概算为92.67亿元。工程于2000年12月26日试通车,2001年9月1日正式通车。我行明珠线投资监理组从1997年5月进
With the reform of the investment system and the deepening of the project legal person system, in order to strengthen the project management and improve the operation efficiency of the funds, the project investment is controlled within the approved total budget estimate, and the investment supervision of the construction project is a new exploration of the supervision mode Get more and more investment subject attention and welcome. We have used the project management experience and advantages accumulated by CCB for a long time to participate in the investment supervision of the first phase of Shanghai Pearl Rail Transit Project. The project is the first elevated elevated rail transit line in Shanghai, a major public transport infrastructure project. A total length of 24.97 km line, of which 21.51 km overhead lines, terrain lines 3.46 km; a total of 19 stations along the way, of which 16 are elevated stations. The first phase of the preliminary design estimate of 9.267 billion yuan. The project was opened to traffic on December 26, 2000 and was officially opened on September 1, 2001. My Pearl Line Investment Supervision Team from May 1997 into