1 概述浙赣复线八五工程光电缆通信工程红门——新塘边段已于1998年9月开通光电缆长途、区段传输网、数字程控交换网,在各中间站配备了智能开关电源的空调等辅助设备。由于没有配备电源监控系统,且中间站皆为无人站,从1998年开通至2000年底,共发生电源中断故障6起,造成光端机、专用通信和无线通信设备的中断,影响了铁路运输的安全。
An overview of the Zhejiang-Jiangxi double-track project eighty-five optical cable communication project Red Gate - Xintang edge section in September 1998 opened the optical cable long-distance, section transmission network, digital program-controlled switching network in the middle of the station is equipped with an intelligent switching power supply Air-conditioning and other auxiliary equipment. Since no power monitoring system is provided and the intermediate stations are all unmanned stations, a total of 6 power interruptions occurred during the period from the opening of 1998 to the end of 2000, resulting in the interruption of optical equipment, dedicated communications and wireless communications equipment, affecting the safety of railway transport .