没有足够的电力,就谈不到国家的工业化,更谈不到电气化了。要生产足够的电力,就必需要有能供应大量发电设备的制造厂。但是,我国目前发电设备制造能力,还不能满足工农业大跃进的需要。为了扭转这一局面,我院最近正在编制8套供省市选用的大型水力或火力发电设备厂及电机厂的典型设计,将于7月完成。这批典型设计,是根据各省电机工业遍地开花,自成完整体系的原则来考虑的,一般的省都有一个火电设备厂与水电设备厂,并建立1—3个中型电机厂。具体
Without enough electricity, we cannot talk about the industrialization of the country, let alone electrification. To produce enough electricity, you must have a factory that can supply a lot of power generation equipment. However, China’s current manufacturing capacity of power generation equipment cannot meet the needs of the great leap forward in the industrial and agricultural sectors. In order to reverse this situation, our hospital is currently preparing eight typical sets of large-scale hydraulic or thermal power plant and motor plants for provinces and cities to use, which will be completed in July. This batch of typical designs is based on the principle that all the province’s motor industries flourish and form a complete system. The general province has a thermal power plant and a hydropower plant, and has established 1-3 medium-sized motor plants. specific