论文部分内容阅读
由于对俄罗斯建筑材料市场需求前景看好,俄罗斯谢韦尔钢铁公司旗下切列波维茨基(Cherepovets)钢厂对其热镀锌生产线进行了升级改造。升级改造后的热镀锌线将于9月下旬重新投入生产。项目耗资约30亿卢布(约合9700万美元)。核心设备于2009年12月进行了更新替换,新设备由比利时的C
Chevrolet Steel’s Cherepovets mills in Russia have upgraded their hot-dip galvanizing lines due to the promising demand for the Russian construction materials market. The upgraded hot-dip galvanizing line will resume production in late September. The project costs about 3 billion rubles (about 97 million U.S. dollars). The core equipment was updated and replaced in December 2009 with new equipment from Belgium C