为了研究大卵石推移质采样器的性能,较准确地进行推移质采样器的检定,1978年经水电部批准列为部属重点科研项目的大型试验渠道,于1979年上半年在四川灌县都江堰上游五公里处的白沙河口建成。经过1979年上半年的投产试验,成功地解决了标准砂的采集问题,下半年作了进一步改进,采用分部导流采砂法解决了大流量下标准砂的采集问题。1980年上半年又进行了扩建,建成了一座长100米,宽3米,深1.2米的矩形试验渠
In order to study the performance of the sampler of the gravel bedrock and conduct a more accurate verification of the bedrock sampler, it was listed as a large-scale test channel under the key scientific research projects approved by the Ministry of Water and Electricity in 1978. In the first half of 1979, Five kilometers at the completion of the Baisha estuary. After the commissioning test in the first half of 1979, the acquisition of standard sand was successfully solved. The second half of the year was further improved. Partitioned diversion sand mining method was adopted to solve the problem of collecting standard sand at high flow rates. In the first half of 1980, an extension was carried out to build a rectangular test channel 100 meters long, 3 meters wide and 1.2 meters deep