砚北矿井建设工期要求很紧 ,监理公司在做好质量控制的同时 ,在进度控制方面做了大量工作 ,取得了良好效果。主要介绍了进度控制方面的一些措施和手段。
Yanbei mine construction period is very tight, supervision of the company in doing good quality control at the same time, a lot of work has been done in the progress of control and achieved good results. Mainly introduces some measures and means of progress control.