风城油田重32井区SAGD先导试验项目是新疆油田公司确立的重点试验项目之一。与之相配套的井下作业技术研究,是项目规模实施的必然要求。由于对SAGD试验井的井下作业无现成经验可循,相关技术人员只能在作业过程中取全取准相关基础资料,边施工边总结经验教训。建立优质的修井液体系不仅是满足修井工程技术的需要,而且还是满足环境保护、油层保护的必然要求。
Fengcheng Oilfield 32 wells SAGD pilot pilot project is Xinjiang Oilfield Company established one of the key pilot projects. Matching the downhole operation technology research, is the inevitable requirement for the implementation of the project scale. Because there is no ready-made experience in the downhole operation of the SAGD pilot well, the relevant technicians can only take the basic data of the full allowance during the operation and summarize the experiences and lessons while constructing. The establishment of high-quality workover fluid system is not only to meet the needs of workover engineering technology, but also to meet the environmental protection, reservoir protection, the inevitable requirement.