论文部分内容阅读
近年来,随着各级水行政主管部门大力推进开发建设项目水土保持设施验收工作,验收程序逐步规范,验收项目的数量逐年上升,但总体验收率还不高,建设单位申请验收的积极性还有待提高,技术评估工作中还有很多问题需要解决。针对存在的问题提出了相应的解决措施:一是强化前期审批,加强监督执法;二是理清思路,强化技术评估服务意识;三是提高评估水平;四是加强与地方各级水行政主管部门的沟通。
In recent years, as the water administrative departments at all levels vigorously promote the acceptance of water and soil conservation facilities for development and construction projects, the acceptance procedures are gradually standardized and the number of acceptance projects is increasing year by year. However, the overall acceptance rate is not high and the enthusiasm of construction units for acceptance inspection remains to be determined There are still many problems to be solved in the process of technical assessment. In order to solve the existing problems, some countermeasures are put forward: one is to strengthen pre-approval and strengthen supervision and enforcement; the other is to clarify the thinking and strengthen the awareness of technical assessment service; the third is to raise the level of assessment; the fourth is to strengthen cooperation with local water administrative departments Communication.