工业与民用建筑工程中,抹灰是一項工程量大、工期长、技术要求高的工程。抹灰工程的工程量,綜合平均为建筑面积的3倍左右,有的建筑物高达6~7倍;施工工期占总工期1/3上下;当年新开工工程,总要到夏秋两季才能开始抹灰,每年8、9月份进入高峰,那时抹灰工人就感不足,有些应該抹灰的工程就不
In the industrial and civil construction projects, plastering is a project with a large amount of construction, long construction period and high technical requirements. The amount of plastering project, an average of about three times the construction area, and some buildings as high as 6 to 7 times; construction period of the total duration of 1/3 up and down; then started the project, the total summer to autumn to start Plastering, peaked in August and September every year, when plastering workers feel inadequate, and some should plastering works