论文部分内容阅读
一、工程概况某工程系制杆车间,于1956年建成投产,跨度15米,车间总长84.48米,柱顶标高7.4米。车间内装有一台5吨桥式吊车(中级工作制)。车间全部为装配式钢筋混凝土结构。屋而结构采用钢筋混凝土薄腹梁(图1、2)。
I. Project Overview A project engineering department bar workshop was completed and put into production in 1956 with a span of 15 meters. The total length of the workshop was 84.48 meters and the height of the column top was 7.4 meters. The workshop is equipped with a 5-ton bridge crane (intermediate working system). The workshops are all assembled reinforced concrete structures. The structure of the house uses reinforced concrete thin-web beams (Figure 1, 2).