论文部分内容阅读
“1000kV同塔双回线路真型塔外绝缘特性试验研究”试验真型塔顺利完成立塔2008年7月24日,国网电力科学研究院输电技术研究所承担的国家电网公司重点项目“1000kV同塔双回线路真型塔外绝缘特性试验研究”试验真型塔顺利完成立塔工作。该试验真型塔高58m,总重104t,两侧横担为非对
“1000kV double tower true line towers on the insulation properties of the experimental test tower” successfully completed the test Tower 2008 years on July 24, State Grid Electric Power Research Institute of Power Transmission Technology Research Institute of the State Grid Corporation of key projects “1000kV Experimental Study on External Insulation Characteristics of True Tower with Double-circuit Lines on the Same Tower ”The test real tower successfully completed the tower work. The test tower true high 58m, total weight 104t, cross-arm on both sides of the right