山东省金乡县在去冬的农田水利建设中,参照基建管理办法管理农田水利建设,收到了工程投资少,工期短,质量高的效果。从1986年9月份试点,到12月底共完成田间建筑物494座,新建配套提灌站、排灌站46处,打机井707眼,建机井房136间,修防渗渠4100米,工程验收全部合格,并在冬灌中投入使用,创造了这个县农田水利建设史上的奇迹。过去这个县轻视对农田水利建设项目的管理,项目和资金全部由乡镇掌握,村组织施工,县水利局只管拨款和一般性的检查指导。加上
In Jindong County, Shandong Province, in the winter farmland water conservancy construction, management of farmland water conservancy construction with reference to the infrastructure management measures received the effect of less project investment, short construction period and high quality. From September 1986 to September, a total of 494 field buildings were completed by the end of December. There were 46 new irrigation and drainage stations, 46 irrigation wells, 707 drilling wells and 136 construction wells and 4100 meters of seepage prevention drains. The project acceptance was all qualified , And put into use in winter irrigation, creating a miracle in the history of farmland water conservancy construction in this county. In the past, this county ignored the management of farmland water conservancy projects, projects and funds are all controlled by the township, village construction, County Water Conservancy Bureau only funding and general inspection guidance. Plus