论文部分内容阅读
通过对梅钢2号高拉速板坯连铸机漏钢原因分析及采取相应措施的总结,认为合格的钢水、工艺和设备参数的最优化及严格操作,是减少漏钢的关键。
Through the analysis of the reasons for the breakout of Meishan No.2 high-speed slab caster and the corresponding measures, it is considered that the optimization and strict operation of the qualified parameters of molten steel, process and equipment are the key points to reduce the breakout.