云南新平县“西水东调”工程是由北线(三江口提水工程)、中线(十里河调水工程)以及南线(蚌岗河调水工程)3个片区各自独立的工程组成,工程任务主要是县城及周边乡镇供水、相关
论文部分内容阅读
云南新平县“西水东调”工程是由北线(三江口提水工程)、中线(十里河调水工程)以及南线(蚌岗河调水工程)3个片区各自独立的工程组成,工程任务主要是县城及周边乡镇供水、相关工业园区用水和灌溉用水。其中设计方案较为明确的中线(十里河水库工程)项建阶段勘察现场工作已于2016年12月下旬正式
Yunnan Xinping County, “West Water Transfer Project” by the northern route (Sanjiangkou lift project), the middle line (Shilihe water diversion project) and the South Line (Benggang River water diversion project) three independent projects Composition, engineering tasks are mainly the town and surrounding township water supply, water and irrigation water related industrial park. Among them, the survey site of the mid-line (Shilihe Reservoir Project) project, which has a relatively clear design plan, was formally started in late December 2016
其他文献
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
针对西南地区山区河流典型水文特点,结合工程实际情况,简要介绍册亨水库导流隧洞进水口体型简化设计的优点,供同类型工程设计借鉴。
Aiming at the typical hydrological ch
本文通过混凝土搅拌桩技术在西荆河枢纽倒虹吸工程基础处理项目施工中的应用,详细阐述了在高含水量淤泥质土复杂地质条件下混凝土搅拌桩施工参数确定、施工工艺要点及注意事
相对于美国、日本、德国等国家来说:我国对不能犯的研究相对较少且较晚,甚至对其定义都没有达成共识,在理论界有以下几种:一是认为不能犯未遂,是指犯罪分子已经着手实行犯罪
观音岩水电站是金沙江中游河段的一座Ⅰ等大(1)型水利工程,该电站左岸混凝土坝段坝基地质条件复杂,溶蚀现象发育,通过固结灌浆生产性试验,经过加密灌浆孔距,使灌浆孔间排距在
《义务教育英语课程标准》强调义务教育阶段英语课程的目的之一就是:使学生掌握一定的语言基础知识和基本技能,建立初步的语感,获得初步运用英语的能力,为真实交际打下基础。
介入治疗临床实践中,冠状动脉置入支架后的内膜增生已成为支架内再狭窄的病理生理机制。因此,抑制平滑肌细胞增殖能预防再狭窄。近年采用的药物涂层支架使支架内再狭窄发生率
在 高 职 院 校 毕 业 生 就 业 形 势 依 然 严 峻 的 情 况 下 , 近 5 年来 ,苏 州高 职 毕 业 生的 就 业 率 一直 保 持 在 95% 以 上 。2003 年,市 区 5 所 骨干 校 毕
不稳定型心绞痛属急性冠脉综合征之一,部分病人可发展为急性心肌梗死或心源性猝死。快速有效地缓解狭窄与痉挛的冠状动脉,是减少急性心肌梗死和心源性猝死的有效措施。我们
目的评价MSCT冠脉造影技术对判断冠状动脉病变的价值。方法对临床疑冠心病40例和2例联合瓣膜病变以及2例冠脉搭桥术后复查患者行冠状动脉MSCT检查,行增强扫描并进行3D图像后