建国36年来,我国水电建设取得了很大成绩,到1985年底,全国水电站装机总容量已达2,516万千瓦,比1949年的16.3万千瓦增长154倍,年发电量900多亿度,为国民经济的发展提供了廉价经济的能源。但是,由于国民经济的高速发展,水电建设的速度还远不能与之相适应,因此,加快水电建设的速度,提高水电建设的经济效益,是我国水电建设努力的方向。1983年9月,胡耀邦同志对电力建设作了“一定要降低建设造价,选择最优方案,缩短建设周期”,做好“第二篇
In the 36 years since the founding of the People’s Republic of China, China’s hydropower construction has achieved great results. By the end of 1985, the total installed capacity of hydropower stations in the country had reached 25.16 million kilowatts, an increase of 154 times from 163 million kilowatts in 1949, and the annual power generation was more than 90 billion kilowatts, which was the national economy. The development provides cheap economical energy. However, due to the rapid development of the national economy, the speed of hydropower construction is still far from being able to adapt to it. Therefore, accelerating the pace of hydropower construction and improving the economic efficiency of hydropower construction are the direction of China’s hydropower construction efforts. In September 1983, Comrade Hu Yaobang made “we must reduce the construction cost, choose the best plan, and shorten the construction period” for power construction.