论文部分内容阅读
云山农场水利队,1979年开始担负对七虎林河的改道工程,这条河在农场境内就有40.3公里长的治理改道任务,交给了该队施工。河两岸地表是草皮和淤泥构成的,属于
Yunshan Farm Water Conservancy team started to divert the construction of the Seven Hulin Rivers in 1979. The river has 40.3 kilometers of remediation tasks on the farm and has handed over construction of the team. The surface of the river is composed of turf and silt, belonging to