论文部分内容阅读
在去年十二月初召开的第六次协调会以后,大连理工大学、上海交通大学、机电部设计研究院和济南第一机床厂参加该项目的人员都按协调会上修订的计划和要求,抓紧引进软件的消化、吸收、应用和国内软件的开发工作,并已取得新的进展。 1.进行了美国专家来华第二、第三次培训,即1989年1月9日到20日,ATS(自动计算工时定额)和TTS(工艺装备管理和跟踪)培训,1989年3月6日到17日,MULTIGROVP(成组技术分析)培训。参加培训人员反映,通过各部份培训后收获较大,进一步熟悉和掌握了OIR公司成组技术各部份软件的功能和应用。 2.由济南一厂承担的主轴、齿盘类零件的设计指导资料已完成,待厂方有关领导审定后,投入实
After the Sixth Coordination Meeting held in early December last year, all personnel participating in the project from Dalian University of Technology, Shanghai Jiaotong University, Mechanical and Electrical Design and Research Institute, and Jinan No.1 Machine Tool Plant stepped up the plan and requirements as revised at the coordination meeting The introduction of software digestion, absorption, application and development of domestic software, and has made new progress. 1. Conducted the second and third training courses for U.S. experts in China from January 9 to January 20, 1989: ATS (Automatic Calculation of Work Hours) and TTS (Process Equipment Management and Tracking) Training, March 6, 1989 Day to 17, MULTIGROVP (group technical analysis) training. Reflected by the training staff, through the training of all parts of the larger gain, further familiar with and mastered the OIR company group technology part of the software functions and applications. 2. Jinan, a plant assumed by the spindle, gear parts design guidance has been completed, after the factory leadership review, put into practice