哥斯达黎加拉加里塔水电站一直面临泥沙淤积问题,该地区具有小水库或调节蓄水池、在用电高峰时段提供电力供应的其他许多水电站同样存在此问题。沉沙池的失事加剧了该问题的严重性。为此,分析了几种常用水库清淤方法的不足,并详细阐述了SediCon疏浚机这一新型疏浚技术的应用效果。此外,简要介绍了其他水电站面临的类似问题。 The Lagarita Hydropower Station in Costa Rica has been facing the problem of sedimentation, which is also present in many other hydropower stations that have small reservoirs or regulators in the area that supply electricity during peak hours. The failure of the grit tank exacerbated the seriousness of the problem. Therefore, the deficiency of several common dredging methods for reservoirs has been analyzed, and the application effect of this new dredging technology of SediCon dredger has been elaborated. In addition, a brief description of similar issues facing other hydropower stations is provided.
其他文献
国际大坝委员会的宗旨是通过信息交流,研究技术、经济、财务、环境和社会现象等问题,促进大坝及有关工程设计、施工、运行和维护技术进步。重点阐述了未来3 a内该委员会的工
摘 要:为了指导我国高职院校校企合作的实践,保障校企知识转移的高效运行,提高企业的自主技术创新能力,提升校企知识转移的效用,以企业技术创新为基础,从高职院校校企知识转移的过程、影响因素及运行三个方面分析探讨高职院校校企知识转移的效用提升策略。  关键词:高职院校 校企知识转移 效用提升 策略  中图分类号:G640 文献标识码:A 文章编号:1007-3973(2013)002-170-02  以
非洲水电资源极其丰富,但因技术等原因,其开发利用率相当低。总部设在挪威的国际水电中心(ICH)为促进非洲水电产业的专家能力建设开展了大量工作。介绍了目前非洲各国的小水
第六届碾压混凝土(RCC)坝国际研讨会于2012年10月23~25日在西班牙萨拉戈萨市召开。来自世界各国的200多名专家回顾了RCC坝的发展历史,重点介绍了西班牙RCC坝的设计和施工技术,
格伦多水电站是苏格兰半个多世纪来兴建的首座常规水电站。由于引水洞部分洞段堵塞,导致工程于2009年停止运行,并已于2010年重启隧洞修复工作。介绍了该项目的背景及具体实施
巴基斯坦曼格拉大坝加高工程是巴基斯坦近年来实施的重要工程项目之一。目前,正在研究该电站扩容改造。介绍了曼格拉坝的进展情况,同时对在巴基斯坦社会经济发展中起重要作用
为达到斐济可再生能源的目标,利用创新型水电项目可满足该国的电力需求。基于可再生能源的开发背景,以南德瑞瓦图项目为例,探讨了该项目建设过程中面临的融资和交付等困难,提
摘 要:企业文化是企业宝贵的无形资源,是企业发展与创新的动力。新时期金融行业企业文化建设应关注行业特性、社会责任及团队建设,并注重在实践中诠释企业文化的内涵,完善规章制度,打造学习型组织,制定激励机制。  关键词:金融行业 企业文化 建设  前言:近年来我国金融体制改革不断深化,金融行业面临更加激烈的市场竞争。企业为提升市场竞争力,掌握竞争主动权,不仅要在业务层面狠下功夫,同时也不能忽视企业文化建
为达到英国政府设置的环境目标,充分利用可再生能源,英国能源技术研究所对潮汐能发电项目进行了调研分析。详细介绍了项目的进展情况,运用潮汐流和潮差技术相结合的发电方式,
为对拱坝进行优化,满足拱坝相关的一套优化准则,列出了15个坝体体型的几何参数,称为拱坝优化要素。通过评估这15个要素,使拱坝优化更为明确合理。这里所采用的优化准则,涉及