山西临汾草峪岭隧洞,采用新奥法施工.由于该洞围岩较软弱,水理性质差,具有弱膨胀性,设计注重了施工监测工作,并经过了4年的监测,为设计、施工、监理等部门提供了大量的数据和分析成果.草峪岭隧洞施工监测从设计到组织实施,以及成果分析应用,均积累了较多的经验,本文对此进行了简要总结,希望对其他类似工程有所帮助.
Linyi, Shandong grass Yuling tunnel, the construction of the new Austrian law. Due to the relatively weak surrounding rock of this cave, poor water quality and weak expansibility, the design pays attention to the construction monitoring work. After 4 years’ monitoring, it provides a great deal of data and analysis results for design, construction and supervision departments. The construction of Caoyuling tunnel construction has accumulated more experience from design to organization implementation and application of result analysis. This article briefly summarizes this and hopes to be able to help other similar projects.