以程潮铁矿东西区开采进度整体调整为工程背景,以FLAC软件为研究手段,建立数值计算模型,设计出5种可行的开采进度方案,通过对比分析每个方案的最大和最小主应力大小,塑性区分布规律,垂直和水平位移变化,以及东西区支撑矿柱附近应力集中系数变化情况,确定东区与西区保持同步掘进和回采进度为最优方案。同时,针对开采区域的矿岩分布和上部开采形成的应力分布,实施应力与时间控制的采场巷道综合维护技术,工程应用效果良好。
Based on the overall adjustment of the mining progress in the east and west of Chengchao Iron Mine as engineering background, FLAC software was used as a research tool to establish a numerical calculation model and design five feasible mining schedule plans. By comparing and analyzing the maximum and minimum principal stress and plasticity The distribution regularity, the vertical and horizontal displacement changes, and the changes of stress concentration factor near the pillar in East and West China were determined. It was determined that the synchronous excavation and the recovery progress were the best in the eastern and western regions. Meanwhile, according to the distribution of ore and rock in the mining area and the stress distribution formed in the upper part, the integrated maintenance technology of mining and roadway with stress and time control is implemented, and the engineering application has a good effect.