工程项目物资管理工作流程的探讨

来源 :建材与装饰 | 被引量 : 0次 | 上传用户:pboss
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在很多交通工程项目施工现场,物资随意堆放、管理不当的问题较为常见,物资调配不及时,不仅会影响工程的顺利进行,而且还会造成严重的浪费问题,因此加强工程项目物资管理至关重要,本文首先对工程项目物资管理进行了介绍,然后对当前工程项目物资管理中的不足进行了分析,并对工程项目物资流程化管理策略进行了详细探究,以期促进工程项目物资管理水平的提升,保障工程项目的正常运转。 In many traffic engineering construction site, materials are randomly piled up. The problems of improper management are relatively common, and the deployment of materials is not timely, which will not only affect the smooth progress of the project, but also cause serious waste. Therefore, it is very important to strengthen the management of project materials , This article first introduces the material management of the project, and then analyzes the deficiencies in the material management of the current project, and explores the materialized flow management strategy of the project in detail, with a view to promoting the improvement of project materials management level, Guarantee the normal operation of the project.
其他文献
随着基础设施建设的开展,给排水工程的安全与质量管理工作对于整个工程项目而言意义重大。为了确保给排水工程的施工安全和质量,在施工过程中要强化给水、排水管道工程的施工
工程竣工结算是承包方最终实现合同目的的关键环节一般而言,工程结算关系着业主和承包商最切身的利益,由于双方的立场不同在结算时业主和承包商就形成了对立统一的关系双方的
期刊
高频词,为耕者谋利 为食者谋福新和源集团董事长李小昆接受记者的专访时,全程围绕着这个关键词展开对李小昆,很多人都有些不理解.他明明可以放手去摘取那风雨之后的硕果,可他
期刊
一、柔性生产的特点rn产品的适应性强,能够比较经济而迅速地实现加工对象的转换,所需的变更是软件的调整及少量设备硬件的变更;易实现工序流程的调整.可根据需要通过软件的调
软土地基是建筑工程的特殊施工区,由于地基结构粘合力弱,破坏了建筑地基耐久性与安全性。基于工程监理体制下,需加强对软土地基工程作业指导力度,确保建筑工程质量达到合同标
本文介绍了弹簧负荷检测的原理 ,以及用PLC可编程控制器输出脉宽调制信号 (PWM)和脉冲序列控制信号 (PTO)实现位置控制的方法 This paper introduces the principle of spri
由于经济技术的快速发展,为建筑业的发展创造了良好的环境,推动了建筑业的快速发展。虽然建筑工程发展历史悠久,在管理上有良好的基础和经验。随着我国开放程度的加深,国外的
中棉所 2 9(以下简称中 2 9)是中国农科院棉花研究所以常规品种中棉所 12号作母本 ,以转基因抗虫棉RP4作父本选育而成 ,1998年 1月通过全国农作物品种审定委员会审定。该组合将
当前我国经济发展速度加快,相关生产需求不断增加,建筑行业在此背景条件下得到了较快的发展。在相关建筑行业快速发展的同时,在施工过程当中逐渐暴露出了一系列的问题,不断约