论文部分内容阅读
自1984年以来,我国在一些项目上(主要是外资和合资项目)开始试行总承包制,取得了一些成功的经验,也存在一些具有共性的问题。总承包的基本出发点,在于促成设计和施工的早期结合,以便有可能充分发挥设计和施工双方的优势,提高项目的经济性,因而对建设单位、设计单位和施工单位都有一定的优越性。但是,这些不同方面的优越性都集中体现在建设单位方面。从建筑市场的竞争机制来看,建设单位处于主动地
Since 1984, China has begun trial implementation of the general contracting system on a number of projects (mainly foreign-funded and joint-venture projects) and has obtained some successful experiences. There are also common problems. The basic starting point of general contracting is to promote the early integration of design and construction, so that it is possible to give full play to the advantages of both design and construction and improve the economic efficiency of the project. Therefore, the construction unit, design unit and construction unit all have certain advantages. However, the advantages of these different aspects are all concentrated in the construction unit. Judging from the competition mechanism of the construction market, the construction unit is on the initiative