论文部分内容阅读
为了解决冬施喷涂技术质量上的难关——析白,我们在上级党委的正确领导下,由北京市第三建筑工程公司、北京市建筑工程研究所、北京市建筑设计院组成以工人为主体的三结合小组,进行了外墙喷涂的中间试验与工程试点工作。在1976年1月12日至22日气温最低(-15℃)、气候恶劣(风力5~6级)的自然条件下,完成了某宿舍楼大模板混凝土墙体外贴加气条板的外墙喷涂冬
In order to solve the difficulties in the quality of winter spraying technology - analyzing white, under the correct leadership of the superior party committee, we are composed of the Beijing No. 3 Construction Engineering Company, the Beijing Institute of Architectural Engineering, and the Beijing Architectural Design Institute. The three-combination team conducted intermediate test and project pilot work on exterior wall painting. In the natural conditions of the lowest temperature (-15°C) and poor weather (5 to 6 winds) from January 12 to 22, 1976, the exterior wall of a dormitory building with large formwork concrete walls was filled with aerated strips. Wall spraying winter