5 内部技术条件长期以来,我国自行设计建设的水电厂都是按照有人(少人)值班的条件设计的。目前正在运行和建设的,总容量近亿万千瓦的不同规模的水电厂,除个别项目外,都未考虑过电厂完全没有一个运行值班人员后会出现什么情况,有什么后果,在工程设计上应有哪些特点,应为此而采取哪些特殊工程措施。由于我们对此还没有很多经验,这个问题只能通过试点实践总结,不断加以妥善解决。
5 Internal technical conditions For a long time, hydropower plants designed and constructed by our country have been designed according to the condition that some people (fewer people) are on duty. Currently under operation and construction, hydropower plants of different sizes with a total capacity of nearly hundreds of millions of kilowatt-hours have not taken into account what happens after a power plant has no one on-duty staff except for individual projects. What are the consequences? In terms of engineering design What should be the characteristics of what special engineering measures should be taken for this purpose. Since we do not have much experience with this issue, this issue can only be solved through trial and fact summary.