新建的固始县引水调蓄工程需要一套完整的电气供电系统对闸门开闭,大坝照明、监控、监测信息设备启闭机等进行控制。通过技术、经济比较,在保障满足工程功能要求的前提下通过深入探讨电源引接系统、电气主接线、主要建筑物供电系统以及节能措施的运用等设计方案,在满足国家规定的电压、频率、功率因数等电能质量要求的前提下力求使一次电气设计方案最合理、投资量最小。
The new Gushi County water diversion and regulation project requires a complete electrical power supply system to control gate opening and closing, dam lighting, monitoring and control, and monitoring information equipment hoist. Through the technical and economic comparison, under the premise of ensuring the project functions meet the requirements of the project, through in-depth discussion of the power lead-in system, the main electrical wiring, the main building power supply system and the use of energy-saving measures such as design options to meet the state regulations voltage, frequency, Factors such as power quality requirements of the premise to make the first electrical design the most reasonable, the minimum amount of investment.