天堂河(北京段)新机场改线下穿京九铁路框架桥,孔跨布置为5×16 m,全长85.6 m,是目前国内单体顶进跨度最大的框架桥。本框架桥采用5孔整体预制,整体顶进,施工中设计最大顶力为26 783 t,施工难度大,安全风险高。通过Midas Civil有限元软件对整个施工工况进行模拟分析,为施工过程提供有效数据,进而保证施工安全稳定。最后从施工工艺、施工监测等方面的优化以保证框架桥在顶进过程中受力安全。
Paradise River (Beijing Section) The new airport is rerouted under the framework of the Beijing-Kowloon Railway Bridge, with a cross-hole layout of 5 × 16 m and a total length of 85.6 m. It is the largest frame bridge spanning the country. The framework of the bridge with 5 holes prefabricated overall, the overall forward, the design of the maximum jacking force for the construction of 26,783 t, the construction of large, high security risk. Through the Midas Civil finite element software simulation analysis of the entire construction conditions for the construction process to provide effective data to ensure construction safety and stability. Finally, from the construction technology, construction monitoring and other aspects of optimization to ensure that the framework of the bridge in the jacking process by force safety.