论文部分内容阅读
本文结合工程案例,介绍室外排水塑料检查井系统施工要点,通过采用整体的控制手段和标准化的施工方法,严密的施工组织,有效提高工作效率,减少了使用中的检修维护费用。
In this paper, the construction case of outdoor drainage plastic inspection well system is introduced in combination with engineering cases. Through the use of overall control measures and standardized construction methods, strict construction organization can effectively improve the work efficiency and reduce the overhaul and maintenance costs in use.