论文部分内容阅读
摘要:一般来讲,工业机电安装项目工程较多处于交通不便、地理环境条件相对较差的地带,由于工程规模涉及面较广、客观条件较为艰苦且需要应用的学科理论具有较大跨度,进一步增加了该环节项目管理难度。如何更好的管理好项目成为一个重要的问题,故本文从内涵特征和管理科学思路等多方面进行了探讨。
关键词:机电安装;工程施工;项目管理
Abstract: generally speaking, industrial mechanical and electrical installation project engineering more in transportation, geographical environment conditions are relatively poor areas, because the project scale to a wide range of and objective conditions and needs of the application is hard discipline theory with larger span and to further increase the link project management difficulty. How to better manage project to become an important problem, in the paper from the connotation characteristics and the management science thinking and so on has carried on the discussion.
Keywords: mechanical and electrical installation; Engineering construction; Project management
中圖分类号:TU71文献标识码:A 文章编号:
一、工业机电安装项目工程内涵特征
工业机电安装施工进程涵盖采购设备、调试安装、运行生产、竣工验收等较多环节,加上随着工业生产规模的持续扩充较多新工艺、新技术、新设备与新材料不断涌现,这就对工业机电工程项目的安装技术与实践管理提出了更高的要求。相比于建筑构筑物工程,验收工业机电工程具有显著的区别,其特征具体体现在评估质量方式、售后服务与验收工程手段层面。由此不难看出,工业机电工程安装与管理具有工期长、难度大、项目管理实施困难等内涵特征。
二、工业机电安装工程实施项目管理科学思路
工业机电安装工程实施项目管理进程中应用费用时间问题、模型及计算方式、网络计划相关技术与费用进度管理手段获取了一定管理成效,同时其应继续结合工业具体机电设备的管理安装工程实施进度、管理费用特征,于开始项目阶段详细制定工程质量、进度与控制成本计划。另外,我们应伴随实际工程的发展实施设备机械、人员、费用的合理安排与投入管理,进而充分满足各工程阶段质量、进度与成本需求,实现项目运行最大化施工利润与最低化成本管理目标。
三、工业机电安装项目工程质量管理
工程项目质量是其实践管理的核心环节,是实现工程任务与工程效益的最基本保证。因此我们应将该项目管理环节作为重点实践工作。
首先,我们应创建以项目经理为核心、总工程师、副经理与各专业负责人、作业班组长统筹构成的控制质量管理体系。由实体工程形成、施工工艺、层次、方式、设备机具、人员素质、建设环境、使用材料与进场管理等层面对工程安装质量实施全面的控制与策划。基于人是影响工程质量的首要因素,我们可通过有效保障人员素质提升工程质量,即保障人员技术水平与素质内涵,通过有效的评估考核合理调整普工与技工比例。对技工我们应要求其持证上岗,科学开展全员性培训,提升施工安装人员综合技能水平。
工程设备质量、半成品、原材料等级、阀件、零部件、配件等材料设备质量也会对工程安装质量产生显著影响。因此,我们应通过严格的技术交底与图纸会审,确保各分项工程、施工组织规范优质,不应轻视上述环节或走过场,而应审查相关图纸设计的规范性,核实其是否符合相关质量技术标准、设计方案是否优化合理。工程施工建设中倘若发觉图纸包含不良问题或缺陷我们应及时申报处理,不应未经批准擅自实施设计变更。日常项目管理中我们应注重整理收集隐蔽工程签证验收资料,避免监督管理流于形式,应做好施工日志的完整记录。
再者,我们应结合工业机电安装项目工程实际状况、施工企业自身水平能力实施因地制宜的综合考量、全面分析,这也有利于全面提升工程安装施工质量。对工程质量产生影响的环境因素包含管理工程环境、技术环境、劳动作业环境等,因此对该类影响因素我们应充分重视并实施科学控制,尽量为工业机电安装项目创设适宜的环境条件。
四、工业机电安装项目工程进度管理
工业安装机电工程建设施工可分为预埋、安装、调试试运行3个阶段,高峰施工期于安装阶段呈现。工程开始后,我们应依据工业总体工程计划进度合理编制控制进度计划,将其控制目标进行细化分解,并依据不同阶段落实施工任务至各作业班组中,进而形成良好的控制项目进度管理体系。同时,我们应依据工业机电安装实际工程各阶段需求进行作业施工安排的合理修正,调配设备机械、施工人员与费用等各投入环节,进而保证工程各阶段目标进度的合理实现。
工业机电安装项目预埋阶段施工主体任务在于配合工业相关土建工程进行施工,安装电气设备的埋件、机电管路等。可以说该阶段工期相对宽松,且承担任务量较小,但此项工作比较繁杂,耗时且成本投入大,产出小,对后续的工期影响也较大,因此在项目进度管理上应主动积极开展安装工作,避免形成前松后紧的不良任务安排状况或出现返工、漏埋错埋埋件的情况。
进入主体安装与试运行工程阶段,我们应依据工业各机组并网发电要求目标与实际现场状况进行施工计划进度的再次细化,对后续设备机械、人员等施工力量进行有效调配,并确保组织施工形式、工序的科学合理安排,我们可应用专业承包或班组管理、技术骨干负责等方式令权责逐步理清并显著提升工程建设进度,良好形成工业机电安装项目工程的建设施工高潮进而合理实现工业机组控制进度综合目标。
五、工业机电安装项目工程安全管理
安全是各类工程项目施工建设的永恒发展目标,因此我们应用建设组织机构、策划安全管理、安全监督检查等实践手段确保工业机电安装项目工程的有序安全开展。建设组织机构层面我们应创设全过程、全方位、全员参与的纵向到底、横向到边的安全管理工程体系,引入各职能机构部门参与,做到人人负责、人人有责的安全机构建设,令各岗位科学明确自身安全管理职责,并负责组织安全活动及日常安全生产管理。
策划安全管理阶段我们应科学编制分布、专项工程组织施工设计,对比较重要的安装发电机定转子、桥式超重机、主变压器等单项工程编制具体的施工措施与安全技术规划方案,进而由人员、制度、设备、材料、资金、技术与施工建设环境等层面作出最优化完善的安排与策划,确保工业机电安装工程的顺利实施。
为监督安全管理效果我们应全方位开展安全监察,尤其应对经常性吊装大件设备实施全面检查管理,核准吊装场地与机具是否包含不良安全隐患。为规范安全管理我们还应落实安全培训与交底,令参与施工的各专业普工、技工充分熟悉安全管理措施与必要的注意事项,通过开展定期安全培训提升项目工程安全管理水平。
六、工业安装机电项目工程成本管理
有效的成本管理可确保项目工程按计划工期顺利开展,因此我们应有效创建基于项目经理核心的控制成本体系,由合同预算单位负责控制成本与管理索赔工作。同时,我们应依据成本项目、工程部位实施成本计划制定,探寻控制成本的有效措施与途径,详细编制目标计划成本控制表与明细表,将具体责任落实到位,对控制成本方式、措施实施及时的整改与定期的检查。
我们还应依据工业安装机电项目的成本项目、工程部位创建收支成本明细表,逐项记录施工进程费用成本,并于每月实施一次结算,令其与目标计划成本实施分析、对比与综合评价。依据工业机电安装项目工程控制成本计划,各级管理人员可对需要用到的材料、人员、机械、设备等提前提出安排与计划,并由项目部统一对各生产要素进行精心策划、调度,做到全面优化配置、动态管理与合理应用,进而有效杜绝由于盲目调度或计划不周引发的窝工、停工、浪费、挤压与低效现象。
七、结语
市场经济的飞速发展、现代化科学技术水平的持续提升令工业工程项目建设规模日益扩大,为较好实现工业机电工程的良好安装,我们只有实施合理、有效、科学的工程项目管理,创设优质管理策略,才能显著提升工程建设水平,促进工业工程建设的全面持续发展。
参考文献:
[1]陆刚,郭玉军,薛长洁。 炼化工程机电安装要点及质量控制[J]。 中国化工装备,2012,(2)。
[2]刘延州。 炼化工程机电安装要点及质量控制[J]。 科技资讯,2012,(7)。
[3]周清侨。 机电安装管理监控及协调探讨[J]。 福建建材,2012,(2)。
[4]李忠意。 机电安装工程电气施工关键工序控制与管理[J]。 四川建材,2012,(1)。
关键词:机电安装;工程施工;项目管理
Abstract: generally speaking, industrial mechanical and electrical installation project engineering more in transportation, geographical environment conditions are relatively poor areas, because the project scale to a wide range of and objective conditions and needs of the application is hard discipline theory with larger span and to further increase the link project management difficulty. How to better manage project to become an important problem, in the paper from the connotation characteristics and the management science thinking and so on has carried on the discussion.
Keywords: mechanical and electrical installation; Engineering construction; Project management
中圖分类号:TU71文献标识码:A 文章编号:
一、工业机电安装项目工程内涵特征
工业机电安装施工进程涵盖采购设备、调试安装、运行生产、竣工验收等较多环节,加上随着工业生产规模的持续扩充较多新工艺、新技术、新设备与新材料不断涌现,这就对工业机电工程项目的安装技术与实践管理提出了更高的要求。相比于建筑构筑物工程,验收工业机电工程具有显著的区别,其特征具体体现在评估质量方式、售后服务与验收工程手段层面。由此不难看出,工业机电工程安装与管理具有工期长、难度大、项目管理实施困难等内涵特征。
二、工业机电安装工程实施项目管理科学思路
工业机电安装工程实施项目管理进程中应用费用时间问题、模型及计算方式、网络计划相关技术与费用进度管理手段获取了一定管理成效,同时其应继续结合工业具体机电设备的管理安装工程实施进度、管理费用特征,于开始项目阶段详细制定工程质量、进度与控制成本计划。另外,我们应伴随实际工程的发展实施设备机械、人员、费用的合理安排与投入管理,进而充分满足各工程阶段质量、进度与成本需求,实现项目运行最大化施工利润与最低化成本管理目标。
三、工业机电安装项目工程质量管理
工程项目质量是其实践管理的核心环节,是实现工程任务与工程效益的最基本保证。因此我们应将该项目管理环节作为重点实践工作。
首先,我们应创建以项目经理为核心、总工程师、副经理与各专业负责人、作业班组长统筹构成的控制质量管理体系。由实体工程形成、施工工艺、层次、方式、设备机具、人员素质、建设环境、使用材料与进场管理等层面对工程安装质量实施全面的控制与策划。基于人是影响工程质量的首要因素,我们可通过有效保障人员素质提升工程质量,即保障人员技术水平与素质内涵,通过有效的评估考核合理调整普工与技工比例。对技工我们应要求其持证上岗,科学开展全员性培训,提升施工安装人员综合技能水平。
工程设备质量、半成品、原材料等级、阀件、零部件、配件等材料设备质量也会对工程安装质量产生显著影响。因此,我们应通过严格的技术交底与图纸会审,确保各分项工程、施工组织规范优质,不应轻视上述环节或走过场,而应审查相关图纸设计的规范性,核实其是否符合相关质量技术标准、设计方案是否优化合理。工程施工建设中倘若发觉图纸包含不良问题或缺陷我们应及时申报处理,不应未经批准擅自实施设计变更。日常项目管理中我们应注重整理收集隐蔽工程签证验收资料,避免监督管理流于形式,应做好施工日志的完整记录。
再者,我们应结合工业机电安装项目工程实际状况、施工企业自身水平能力实施因地制宜的综合考量、全面分析,这也有利于全面提升工程安装施工质量。对工程质量产生影响的环境因素包含管理工程环境、技术环境、劳动作业环境等,因此对该类影响因素我们应充分重视并实施科学控制,尽量为工业机电安装项目创设适宜的环境条件。
四、工业机电安装项目工程进度管理
工业安装机电工程建设施工可分为预埋、安装、调试试运行3个阶段,高峰施工期于安装阶段呈现。工程开始后,我们应依据工业总体工程计划进度合理编制控制进度计划,将其控制目标进行细化分解,并依据不同阶段落实施工任务至各作业班组中,进而形成良好的控制项目进度管理体系。同时,我们应依据工业机电安装实际工程各阶段需求进行作业施工安排的合理修正,调配设备机械、施工人员与费用等各投入环节,进而保证工程各阶段目标进度的合理实现。
工业机电安装项目预埋阶段施工主体任务在于配合工业相关土建工程进行施工,安装电气设备的埋件、机电管路等。可以说该阶段工期相对宽松,且承担任务量较小,但此项工作比较繁杂,耗时且成本投入大,产出小,对后续的工期影响也较大,因此在项目进度管理上应主动积极开展安装工作,避免形成前松后紧的不良任务安排状况或出现返工、漏埋错埋埋件的情况。
进入主体安装与试运行工程阶段,我们应依据工业各机组并网发电要求目标与实际现场状况进行施工计划进度的再次细化,对后续设备机械、人员等施工力量进行有效调配,并确保组织施工形式、工序的科学合理安排,我们可应用专业承包或班组管理、技术骨干负责等方式令权责逐步理清并显著提升工程建设进度,良好形成工业机电安装项目工程的建设施工高潮进而合理实现工业机组控制进度综合目标。
五、工业机电安装项目工程安全管理
安全是各类工程项目施工建设的永恒发展目标,因此我们应用建设组织机构、策划安全管理、安全监督检查等实践手段确保工业机电安装项目工程的有序安全开展。建设组织机构层面我们应创设全过程、全方位、全员参与的纵向到底、横向到边的安全管理工程体系,引入各职能机构部门参与,做到人人负责、人人有责的安全机构建设,令各岗位科学明确自身安全管理职责,并负责组织安全活动及日常安全生产管理。
策划安全管理阶段我们应科学编制分布、专项工程组织施工设计,对比较重要的安装发电机定转子、桥式超重机、主变压器等单项工程编制具体的施工措施与安全技术规划方案,进而由人员、制度、设备、材料、资金、技术与施工建设环境等层面作出最优化完善的安排与策划,确保工业机电安装工程的顺利实施。
为监督安全管理效果我们应全方位开展安全监察,尤其应对经常性吊装大件设备实施全面检查管理,核准吊装场地与机具是否包含不良安全隐患。为规范安全管理我们还应落实安全培训与交底,令参与施工的各专业普工、技工充分熟悉安全管理措施与必要的注意事项,通过开展定期安全培训提升项目工程安全管理水平。
六、工业安装机电项目工程成本管理
有效的成本管理可确保项目工程按计划工期顺利开展,因此我们应有效创建基于项目经理核心的控制成本体系,由合同预算单位负责控制成本与管理索赔工作。同时,我们应依据成本项目、工程部位实施成本计划制定,探寻控制成本的有效措施与途径,详细编制目标计划成本控制表与明细表,将具体责任落实到位,对控制成本方式、措施实施及时的整改与定期的检查。
我们还应依据工业安装机电项目的成本项目、工程部位创建收支成本明细表,逐项记录施工进程费用成本,并于每月实施一次结算,令其与目标计划成本实施分析、对比与综合评价。依据工业机电安装项目工程控制成本计划,各级管理人员可对需要用到的材料、人员、机械、设备等提前提出安排与计划,并由项目部统一对各生产要素进行精心策划、调度,做到全面优化配置、动态管理与合理应用,进而有效杜绝由于盲目调度或计划不周引发的窝工、停工、浪费、挤压与低效现象。
七、结语
市场经济的飞速发展、现代化科学技术水平的持续提升令工业工程项目建设规模日益扩大,为较好实现工业机电工程的良好安装,我们只有实施合理、有效、科学的工程项目管理,创设优质管理策略,才能显著提升工程建设水平,促进工业工程建设的全面持续发展。