摘要:随着社会的发展,高层建筑在城市中也越来越多。但是由于高层建筑工程量比较大,再加之高层建筑结构复杂,使得对高层建筑的施工具有很高的难度。在高层建筑的施工中,如果能实行有效的施工管理办法,会有效的控制施工成本,同时还可以减少建设工期。本文主要结合现在高层建筑的施工特点,总结出了一套利于高层建筑施工的管理办法。
关键词:高层建筑;施工管理
Abstract: with the development of society, the high-rise buildings in the city more and more. But because of high building project is bigger, plus high building structure is complex, which makes the high-rise building construction is of high difficulty. In the high-rise building construction, if can carry out effective construction management way, will be effective control of construction cost, also can reduce the construction period. This paper now the construction features of the high-rise building, summed up a set of high-rise building for management of the construction of the measures.
Keywords: high building; Construction management
中圖分类号:[TU208.3]文献标识码:A文章编号:
前言:由于高层建筑结构复杂,加之工程施工量比较大,所使用的建筑材料复杂,这就对高层建筑施工管理要求较高。加强高层建筑施工的管理,杜绝事故的发生,确保施工质量,是一项重要的工作。在实际工作中,要综合分析高层建筑中问题产生的原因,并且努力的寻求解决问题的办法。另外,还要注重对员工的教育、培养安全管理的意识、加强质量管理,建造质量可靠的高层建筑,这样才能造福于人民和社会。
一、高层建筑施工中的主要问题和原因
1.1 技术质量方面
随着对高层建筑质量的要求越来越高,在高层建筑施工中的科技含量也越来越高,对于高层建筑中各专业的技术操作的要求也越来越高。但是在现实的施工过程中,施工人员往往达不到各种专业技术的操作,在施工中往往会产生许多的问题。
1.2 管理方面
在现行管理体制下,施工单位分包现象普遍存在,分包单位在工作范围的界定上很难做到明确具体。主观上各单位在利益的驱使下,总希望相关单位承担更多的工作。往往造成工序上的遗漏,人为带来一些问题,增加了协调管理的复杂性。此外,施工组织管理不健全,施工人员、管理人员的水平素质参差不齐,会给施工中各专业的协调工作带来困难与不便,也是产生问题的重要原因。
二、高层建筑施工管理措施
2.1 做好施工预案。
施工单位应针对高层建筑的特点编制严谨、详尽的施工组织和管理方案。用来指导整个施工过程。内容包括:施工工序的安排,各工种进入工地的时间,关键部位的施工方法,对易出现的质量问题提出预控措施,制定出成品保护措施等。
2.2 做好施工阶段的进度控制。
由于现代高层建筑具有规模庞大,工程结构与工艺复杂,建设周期长及相关单位多等特点,决定了工程进度将受到许多因素的影响,要想有效地控制工程进度,就必须对影响进度的有利因素和不利因素进度全面、细致的分析和预测。这样一方面可以促进对有利因素的充分利用和对不利因素的预防;另一方面也便于来制定预防措施,事中采取有效对策,事后进度妥善补救,以缩小实际进度与计划进度的偏差,实现对高层建筑进度的静态控制和动态控制。高层建筑施工进度是一个动态实施过程。施工进度计划在实施过程中,会因为新情况的产生,各种干扰因素和风险因素的作用面发生变化,使人们难以在执行过程中检查工程项目实际进度发展情况,并将实际状况与计划安排进度做一对比,从中得出偏离计划的信息,然后在分析偏差及其产生原因的基础上,通过采取组织、技术、经济等措施维待原计划的正常实施。如果采取措施后不能维待原计划,则需要对原计划进度调整和修正,再按照新的进度计划实施。
实施进度控制的目标就通过有效的进度控制工作和具体的进度控制措施,在满足投资和质量的前提下,力求使高层建筑的实际工期不超过计划工期,以保证高层建筑按期完成。在高层建筑计划阶段所确定的工期目标,往往是综合考虑各个方面的因素而确定的合理工期,因此,时间上的任何变化,无论是进度拖延还是超前,都可能造成其它目标的失控。例如,在一个高层建筑施工总进度设计中,由于某项工作的进度超前,致使能源的需求发生变化,而打乱原计划对人、材、机等资源的合理安排,亦将影响资金计划的使用和安排,特别是多个作业队平行施工时,由此引起后续工作时间安排的变化,势必给项目总体的协调工作带来许多困难。因此,如果高层建筑实施过程中出现进度超前的情况,进度控制人员必须综合分析进度超前对后续工作产生的影响,提出合理的进度调整方案,以确保工期总目标的顺利实现。
2.3 严格控制高层建筑的工程变更。
由于建筑设计与工程实际情况不可能完全一致,设计人员的技术水平和工作能力使设计图纸未达到开发商的要求和施工的深度,开发商根据实际情况对工程的修改或补充等原因致使工程变更和设计变更在所难免。而这些变更必然会带来工程量的增减和工程造价的变化,极端情况下会出现工程造价难于控制的局面。因此,在设计部门应切实做好调研工作,弄清开发商真实意图,对施工场地进行详细踏勘。在施工过程中应严格控制工程量,力求变更最少。
2.4 做好高层建筑施工监理工作。
高层建筑施工监理十分重要,它是监督工程质量、确保工程进度、控制工程造价的重要环节。监理工程师在施工阶段关系到是否要设计变更和工程变更的决定时,他们往往能根据自身的技术优势做出合理正确的选择,这一点许多建设方代表因其经验、阅历及技术受各方面的条件制约而无法做到。再者,在施工过程中,甲、乙两方因各自的立场、观点不同,有时会出现一些影响施工正常进行的情况,监理单位作为公正的第三方,在施工过程中协调双方关系,确保工程施工正常进行,这样能为完成工程造价控制提供有利条件。
高层建筑施工管理展望加强管理,是指在现有管理水平的基础上,针对影响工程质量品质的一些关键问题,从技术、人事制度上建立更有效、更科学的管理体制,明确每一个施工人员的目标责任。从而达到进一步提高管理水平的目的。质量管理方法:要根据建筑工程质量目标,制定相应的质量验收标准,严把材料质量关。采购的材料要符合国家规范标准和设计要求,严格执行材料验收制度。确保主体结构质量。在施工装饰阶段,一定要克服质量通病,搞好细部处理,在装饰水准上要高标准、严要求,要有创新和特色。抓好地下室、一层、顶层、屋面、卫生间以及楼梯走道等关键部位施工。同时,要积极推广应用新技术新材料。随着科技进步,新材料、新技术不断涌现,施工企业要及时掌握这些信息、积极应用到高层建筑中来。成本管理方法:建筑的成本控制就是在高层建筑成本的形成过程中,对生产经营所消耗的人力资源、机械设备、物质供应和费用开支进行指导、监督、调节和限制,把各项生产费用控制在计划成本范围之内,保证成本目标的实现。项目经理是应及时掌握和分析盈亏状况,并迅速采取有效措施。安全管理方法:要制定安全守则、安全责任书,发生安全事故,各级责任人和班组都要承担一定经济责任。确保安全设施投资到位。高层建筑的施工协调非常重要。施工中协调部分的常见问题包括:电气与土建的协调;给排水与建筑结构的协调;建筑的外表、功能与结构的关系;各种预制件、预埋件、装饰与结构的关系、施工的特点、要求;各辅助专业之间的协调等。做好协调工作的核心就是通盘考虑和过程控制。产品质量的好坏与从业人员的水平素质不可分。在搞好管理的同时,应加强施工管理人员的技术培训和专业水平的提高,以及对新技术产品的了解掌握。培养施工人员的敬业精神与细致的工作作风,施工中不遗琐碎,不留后患。最后,在现有建筑施工管理水平的基础上,应针对影响高层建筑质量品质的一些关键问题,从技术、人事制度上建立更有效的、更加科学的管理机制,并且要落实到人、落实到班组,明确每一个施工人员的目标责任,从而达到进一步提高管理水平的目的。
总结:高层建筑施工项目的成功管理不仅对项目、对企业有良好经济效益,对国家也会产生良好的社会效益。成功的施工管理,能促进高层建筑和企业的发展,能推动建筑市场不断进。开拓创新,总结经验,在高层建筑的实践中不断摸索,最终创造出一条高层建筑施工项目管理的成功之路。
参考文献:
[1] 黄文建.浅谈建筑工程施工管理措施[J].建材发展导向,2011(14).
[2] 王灵娟.高层建筑施工管理问题研究[J].科技向导,2011(26).
注:文章内所有公式及图表请用PDF形式查看。
关键词:高层建筑;施工管理
Abstract: with the development of society, the high-rise buildings in the city more and more. But because of high building project is bigger, plus high building structure is complex, which makes the high-rise building construction is of high difficulty. In the high-rise building construction, if can carry out effective construction management way, will be effective control of construction cost, also can reduce the construction period. This paper now the construction features of the high-rise building, summed up a set of high-rise building for management of the construction of the measures.
Keywords: high building; Construction management
中圖分类号:[TU208.3]文献标识码:A文章编号:
前言:由于高层建筑结构复杂,加之工程施工量比较大,所使用的建筑材料复杂,这就对高层建筑施工管理要求较高。加强高层建筑施工的管理,杜绝事故的发生,确保施工质量,是一项重要的工作。在实际工作中,要综合分析高层建筑中问题产生的原因,并且努力的寻求解决问题的办法。另外,还要注重对员工的教育、培养安全管理的意识、加强质量管理,建造质量可靠的高层建筑,这样才能造福于人民和社会。
一、高层建筑施工中的主要问题和原因
1.1 技术质量方面
随着对高层建筑质量的要求越来越高,在高层建筑施工中的科技含量也越来越高,对于高层建筑中各专业的技术操作的要求也越来越高。但是在现实的施工过程中,施工人员往往达不到各种专业技术的操作,在施工中往往会产生许多的问题。
1.2 管理方面
在现行管理体制下,施工单位分包现象普遍存在,分包单位在工作范围的界定上很难做到明确具体。主观上各单位在利益的驱使下,总希望相关单位承担更多的工作。往往造成工序上的遗漏,人为带来一些问题,增加了协调管理的复杂性。此外,施工组织管理不健全,施工人员、管理人员的水平素质参差不齐,会给施工中各专业的协调工作带来困难与不便,也是产生问题的重要原因。
二、高层建筑施工管理措施
2.1 做好施工预案。
施工单位应针对高层建筑的特点编制严谨、详尽的施工组织和管理方案。用来指导整个施工过程。内容包括:施工工序的安排,各工种进入工地的时间,关键部位的施工方法,对易出现的质量问题提出预控措施,制定出成品保护措施等。
2.2 做好施工阶段的进度控制。
由于现代高层建筑具有规模庞大,工程结构与工艺复杂,建设周期长及相关单位多等特点,决定了工程进度将受到许多因素的影响,要想有效地控制工程进度,就必须对影响进度的有利因素和不利因素进度全面、细致的分析和预测。这样一方面可以促进对有利因素的充分利用和对不利因素的预防;另一方面也便于来制定预防措施,事中采取有效对策,事后进度妥善补救,以缩小实际进度与计划进度的偏差,实现对高层建筑进度的静态控制和动态控制。高层建筑施工进度是一个动态实施过程。施工进度计划在实施过程中,会因为新情况的产生,各种干扰因素和风险因素的作用面发生变化,使人们难以在执行过程中检查工程项目实际进度发展情况,并将实际状况与计划安排进度做一对比,从中得出偏离计划的信息,然后在分析偏差及其产生原因的基础上,通过采取组织、技术、经济等措施维待原计划的正常实施。如果采取措施后不能维待原计划,则需要对原计划进度调整和修正,再按照新的进度计划实施。
实施进度控制的目标就通过有效的进度控制工作和具体的进度控制措施,在满足投资和质量的前提下,力求使高层建筑的实际工期不超过计划工期,以保证高层建筑按期完成。在高层建筑计划阶段所确定的工期目标,往往是综合考虑各个方面的因素而确定的合理工期,因此,时间上的任何变化,无论是进度拖延还是超前,都可能造成其它目标的失控。例如,在一个高层建筑施工总进度设计中,由于某项工作的进度超前,致使能源的需求发生变化,而打乱原计划对人、材、机等资源的合理安排,亦将影响资金计划的使用和安排,特别是多个作业队平行施工时,由此引起后续工作时间安排的变化,势必给项目总体的协调工作带来许多困难。因此,如果高层建筑实施过程中出现进度超前的情况,进度控制人员必须综合分析进度超前对后续工作产生的影响,提出合理的进度调整方案,以确保工期总目标的顺利实现。
2.3 严格控制高层建筑的工程变更。
由于建筑设计与工程实际情况不可能完全一致,设计人员的技术水平和工作能力使设计图纸未达到开发商的要求和施工的深度,开发商根据实际情况对工程的修改或补充等原因致使工程变更和设计变更在所难免。而这些变更必然会带来工程量的增减和工程造价的变化,极端情况下会出现工程造价难于控制的局面。因此,在设计部门应切实做好调研工作,弄清开发商真实意图,对施工场地进行详细踏勘。在施工过程中应严格控制工程量,力求变更最少。
2.4 做好高层建筑施工监理工作。
高层建筑施工监理十分重要,它是监督工程质量、确保工程进度、控制工程造价的重要环节。监理工程师在施工阶段关系到是否要设计变更和工程变更的决定时,他们往往能根据自身的技术优势做出合理正确的选择,这一点许多建设方代表因其经验、阅历及技术受各方面的条件制约而无法做到。再者,在施工过程中,甲、乙两方因各自的立场、观点不同,有时会出现一些影响施工正常进行的情况,监理单位作为公正的第三方,在施工过程中协调双方关系,确保工程施工正常进行,这样能为完成工程造价控制提供有利条件。
高层建筑施工管理展望加强管理,是指在现有管理水平的基础上,针对影响工程质量品质的一些关键问题,从技术、人事制度上建立更有效、更科学的管理体制,明确每一个施工人员的目标责任。从而达到进一步提高管理水平的目的。质量管理方法:要根据建筑工程质量目标,制定相应的质量验收标准,严把材料质量关。采购的材料要符合国家规范标准和设计要求,严格执行材料验收制度。确保主体结构质量。在施工装饰阶段,一定要克服质量通病,搞好细部处理,在装饰水准上要高标准、严要求,要有创新和特色。抓好地下室、一层、顶层、屋面、卫生间以及楼梯走道等关键部位施工。同时,要积极推广应用新技术新材料。随着科技进步,新材料、新技术不断涌现,施工企业要及时掌握这些信息、积极应用到高层建筑中来。成本管理方法:建筑的成本控制就是在高层建筑成本的形成过程中,对生产经营所消耗的人力资源、机械设备、物质供应和费用开支进行指导、监督、调节和限制,把各项生产费用控制在计划成本范围之内,保证成本目标的实现。项目经理是应及时掌握和分析盈亏状况,并迅速采取有效措施。安全管理方法:要制定安全守则、安全责任书,发生安全事故,各级责任人和班组都要承担一定经济责任。确保安全设施投资到位。高层建筑的施工协调非常重要。施工中协调部分的常见问题包括:电气与土建的协调;给排水与建筑结构的协调;建筑的外表、功能与结构的关系;各种预制件、预埋件、装饰与结构的关系、施工的特点、要求;各辅助专业之间的协调等。做好协调工作的核心就是通盘考虑和过程控制。产品质量的好坏与从业人员的水平素质不可分。在搞好管理的同时,应加强施工管理人员的技术培训和专业水平的提高,以及对新技术产品的了解掌握。培养施工人员的敬业精神与细致的工作作风,施工中不遗琐碎,不留后患。最后,在现有建筑施工管理水平的基础上,应针对影响高层建筑质量品质的一些关键问题,从技术、人事制度上建立更有效的、更加科学的管理机制,并且要落实到人、落实到班组,明确每一个施工人员的目标责任,从而达到进一步提高管理水平的目的。
总结:高层建筑施工项目的成功管理不仅对项目、对企业有良好经济效益,对国家也会产生良好的社会效益。成功的施工管理,能促进高层建筑和企业的发展,能推动建筑市场不断进。开拓创新,总结经验,在高层建筑的实践中不断摸索,最终创造出一条高层建筑施工项目管理的成功之路。