论文部分内容阅读
兖州矿业(集团)公司济宁二号煤矿对该矿第1个条带式开采综放工作面在回采过程中的液压支架压力和巷道变形进行了监测。6312工作面两顺槽与六采区带式输送机巷和辅助运输巷相连构成生产系统。
The Jining No.2 coal mine of Yanzhou Mining (Group) Co., Ltd. monitored the hydraulic support pressure and roadway deformation of the first fully mechanized top coal caving mining face in the mine during the mining process. 6312 face with two trough and six mining belt conveyor lane and auxiliary transport lane connected to form a production system.