论文部分内容阅读
为了提高转炉炉龄,节约炉衬材料。冶金部与金属学会于十一月十二日至十七日在北京联合召开全国重点省、市和企业转炉炉衬座谈会。参加公议的代表有工人、技术人员、生产部门的领导干部以及先进生产者等共五十余人。会上交流并总结了大跃进以来转炉炉衬工作的先进经验,讨论并明确了转炉炉衬的技术改进方向和任务,并提出了进一步提高转炉炉龄,降低炉衬材料消耗的奋斗目标和措施,会议要求推广一系列的先进快速操作法(快速打砖、快速砌炉、快速烘炉以至不烘炉炼钢
In order to improve the furnace furnace, saving lining materials. The Ministry of Metallurgy and Metallurgy jointly held a forum on linings for converter furnaces of major provinces, cities and enterprises in Beijing from November 12 to November 17. Representatives participating in the conference include a total of more than 50 workers, technicians, leading cadres in the production sector and advanced producers. The meeting exchanged and summarized the advanced experiences of the converter lining work since the Great Leap Forward, discussed and clarified the technical improvement direction and tasks of the converter lining, and put forward the objectives and measures for further improvement of the converter furnace service life and the reduction of consumption of the lining material. Meeting requirements Promote a series of advanced rapid operation method (quick bricks, fast build furnace, fast drying furnace and not even oven steelmaking