工程概况工程位于北京市朝阳区王四营乡,占地面积7.32公顷,批准概算31.94亿元,竣工决算31.89亿元。由华能国际电力股份有限公司等三家单位出资兴建,由天津电建等四家单位参建。采用两台东方电气与日本三菱合作生产的M701F4燃机和一台背压供热-凝汽式汽轮机,组成一套“二拖一”联合循环供热机组。联合循环机组发电出力952MW,供热能力662MW,最大热效率88.77%,发电煤耗138g/KWh,厂用电率1.378%。工程2010年8月6日开工建设,2011年12月26日正式投产。设计理念工程遵循“创新、高效、绿色、环保”的设计理念,本着“安全可靠、经济适用、系统优化、技术先进”的设计原则,通过优化设计和科学创新,实现经济效益、社会效益和环保效益的有机统一。
Project Overview Project is located in Chaoyang District, Beijing Wang Siying Township, covers an area of 7.32 hectares, approved the estimated budget of 3.194 billion yuan, the final accounts 3.189 billion yuan. Huaneng Power International Co., Ltd. and other three units funded by the construction, by the Tianjin Electric Construction and other four units to participate. Adopting two M701F4 gas turbines co-produced by Dongfang Electric and Japan’s Mitsubishi and a back-pressure heating-condensing steam turbine to form a set of “two to one” combined cycle heating units. Combined cycle unit power output of 952MW, heating capacity of 662MW, the maximum thermal efficiency of 88.77%, generating coal consumption 138g / KWh, power plant rate of 1.378%. Engineering August 6, 2010 started construction, December 26, 2011 formally put into operation. Design Concept The project follows the design concept of “innovation, high efficiency, green, environmental protection” and based on the design principle of “safe, reliable, economical, systematic and advanced”, through the optimized design and scientific innovation, to realize the economic benefits , Organic and environmental benefits of organic unity.