房屋征收、管线迁改、道路保通、工程组织、工程进度、质量管理、安全管理、文明施工等等,每一项工作都是庞大工程,每一个障碍都是一道难关。“郑州市陇海路快速通道工程”是中国电建集团在郑州市的第二个大型B T项目,由中电建路桥集团牵头,水电三局、水电五局和水电十一局等4家单位按比例出资建设,工程施工总投资约80亿元,总工期460天,主线全长约29公里,是横贯郑州城区的市政交通大动脉。2013年底,水电五局组建成立了
House collection, pipeline relocation, road maintenance, engineering organization, project progress, quality management, safety management, civilized construction and so on. Each work is a huge project and every obstacle is a difficult one. “Zhengzhou Longhai Expressway Project ” is the second large-scale BT project of China State Construction Group in Zhengzhou City, led by CLP Power Road & Bridge Group, including 4 hydropower stations, 5 hydropower stations and 11 hydropower stations The unit is funded on a pro-rata basis. The total construction investment is about 8 billion yuan and the total construction period is 460 days. The main line is about 29 kilometers long and is the main artery of the municipal traffic running across the urban area of Zhengzhou. The end of 2013, the establishment of the five hydropower set up