Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydr

来源 :岩石力学与岩土工程学报:英文版 | 被引量 : 0次 | 上传用户:myna5726
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
其他文献
This study introduced at first the background of numerous highway widening projects that have been developed in recent years in China.Using a large ground settl
期刊
期刊
Coal bed methane control with low permeability is a hot issue at present.The current status of coal bed methane control in China is introduced.The government-su
The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River.The project includes a r
In-situ stress is an essential parameter for design and construction of most engineering projects that involve excavation in rocks.Progress in in-situ stress me
Earthen sites,which are mainly made of earth,are cultural heritages with historical,artistic and scientific values.Many extremely valuable earthen sites have be
Uniaxial compression tests(UCTs)on 34 naturally fractured marble samples taken from the transportation tunnels of Jinping II hydropower station were carried out
In this paper,the bolt-and cable-supported structures mainly refer to anchored cables,anchored bolts,soil nails and other commonly used reinforcing and supporti
冬末春初是梅花鹿养殖最困难的时期,鹿群常因环境质量和营养水平不良,造成抗病能力下降,出现死亡或者体质衰弱的现象。搞好梅花鹿冬春季节饲养管理,是梅花鹿养殖过程中重要的生产
为了进一步推进梅花鹿产业快速发展,吉林省东丰县紧紧抓住梅花鹿产业被确定为全省重点特色产业的有利机遇,举全县之力推进梅花鹿产业开发。