ZZ5600支撑掩护式液压支架是大同市青磁窑煤矿综采工作面的重要支护设备。由于其结构设计的缺陷,顶梁发生了柱窝脱离穿破顶板的严重破损现象。而且,由于液压系统的结构复杂,配件特殊,一时难以维修。因原设计的不合理造成工作面一些支架被压人采空区无法取出,严重影响了井下工作面的正常生产,并导致了该矿原煤产量和矿方经济效益的下滑。支架的彻底改造已势在必行。 当我厂承揽了该支架的大修改造任务后,我们多次组织技术人员赴青矿现场考查、测绘,对ZZ5600型液压支架的结构形式、改造部位,以及改造以后的状况都做了认真细致地分析、研究。经多次论证,确认该种支架易于损坏的原因是:支架原结构承载能力较弱,整体性能较差;液压系统配置不合理,结构
ZZ5600 supporting shield type hydraulic support is Datong Qingyang kiln coal mining face an important support equipment. Owing to the defect of its structural design, a serious damage phenomenon occurs in the top beam, which is away from the pierced roof. Moreover, due to the complicated hydraulic system structure, special accessories, sometimes difficult to repair. Due to the unreasonable original design, some supports on the working face could not be removed from the goaf, which seriously affected the normal production of underground working face and led to the decline of raw coal output and economic benefit of the mine. The complete transformation of the stent is imperative. When I plant the task of overhauling the stent, we repeatedly organized technical personnel went to the Qinghai field test, mapping, ZZ5600-type hydraulic support structure, the transformation of the site, as well as the status of the transformation have done a careful and meticulous Analysis. After several demonstrations to confirm the kind of stent is easy to damage because: the original structure of the stent carrying capacity is weak, the overall performance is poor; hydraulic system configuration is not reasonable, the structure