施工总布置是施工组织设计的重要组成部分 ,它以总布置图的形式反映施工期内拟建的永久建筑物、施工临时设施的布局。根据西霞院工程所在地的交通现状 ,在综合分析枢纽工程布置、主体建筑物特点、社会环境及自然条件等基础上 ,合理确定工程施工内外交通运输和施工工厂规模 ,统筹规划布置施工临时设施 ,妥善处理施工场地内外关系及场内各施工工厂之间的关系 ,使布局合理、规模适中 ,以加快施工进度、节约工程投资
The general construction layout is an important part of the construction organization design. It reflects the layout of the permanent buildings and temporary facilities to be built during the construction period in the form of a general layout plan. Based on the traffic conditions of the Xixiayuan project site, based on the comprehensive analysis of the layout of the hub project, the characteristics of the main building, social environment and natural conditions, the scale of the transportation and construction factories inside and outside the project construction should be reasonably determined, the temporary facilities for construction, Properly deal with the internal and external relations of the construction site and the relationship among various construction factories in the yard so that the layout is reasonable and the scale is moderate so as to speed up the construction progress and save the investment in construction