论述三个问题:一是在防洪问题上,要防止等待三峡工程和有了三峡工程就万事大吉的思想;二是发展水电要先支流后干流,要水火结合,因地制宜;三是川江应是“航运第一”,不应是“防洪第一”,在泥沙问题未解决前应先整治航道。三峡工程规模最大,工期最长,花钱最多,是长江开发中的主体工程。能不能兴建,要充分论证,不能急于决定这一长远大局,以防劳民伤财,贻害子孙万代。
Discusses three issues: First, on the issue of flood control, to prevent waiting for the Three Gorges Project and the Three Gorges Project on the idea that everything will be fine; Second, the development of hydropower should be the first tributary of the mainstream, it should be combined with water and fire, local conditions; Third, Chuanjiang should be “shipping First ”should not be“ flood prevention first ”, and the navigation channel should be rectified before the sediment issue is not solved. The Three Gorges Project has the largest scale, the longest construction period and the most money. It is the main project in the development of the Yangtze River. Can not build, to fully justify, not in a hurry to decide on the long-term overall situation, to prevent people from spending money, harming generations.