论文部分内容阅读
煤田地质第一勘探公司147队与中国矿业大学共同承担的《大屯矿区水文地质条件及勘探方法研究》课题;于1989年5月在徐州通过鉴定。课题提交了“卫星遥感地质构造解释”、“储水构造分析”、“水文地球化学特征分析”和“水文地质勘探方法研究”等项成果。
Coalfield Geological Exploration Company 147 team and China University of Mining shared the “Datun mining area hydrogeological conditions and exploration methods” project; in May 1989 in Xuzhou passed the appraisal. Submission of “remote sensing interpretation of geological structure,” “storage structure analysis”, “hydrogeochemical characteristics analysis” and “hydrogeological exploration method research” and other items.