全苏黑色冶金矿物机械加工科学研究设计院别尔戈罗德分院与黑色冶金矿物机械加工科学研究设计院、米哈伊洛夫采选公司共同对该公司选矿厂Ⅱ系列脱水车间进行了改进。选矿厂Ⅰ系列脱水车间的设备是按工段单独配置的。Ⅱ系列则不同,是联合配置的。以对7个工段的联合精矿进行脱水,其总生产能力按原矿计为1500万t/a。根据原来的流程设计,来料在80/250型磁选
All Su Black Metallurgy and Minerals Processing Science Research and Design Institute Beiergode Branch and the Black Metallurgy Minerals Processing Science Research and Design Institute, Mikhailov mining company together on the company beneficiation plant Ⅱ series dewatering workshop was improved. Concentrator Ⅰ series dewatering plant equipment is configured by the separate section. Ⅱ series is different, is the joint configuration. In order to dehydrate the joint concentrate of 7 sections, its total production capacity will be 15 million t / a according to the original ore. According to the original process design, incoming in the 80/250 type magnetic separation