论文部分内容阅读
阿里河林业局西棱梯林场在促进工队文明建设和改善生产第一线职工的工作与生活条件方面办了几件实事: 一、各工队都建起小浴池,解决了洗澡难的问题; 二、改进了取暖设备。小工队把过去用砖砌的“地火龙”改为铁铸管式对接“地火龙”,搬家携带方便,可以长期使用; 三、工队宿舍里,每人配备一张可拆式铁床、一领棕垫、一张床单、一个床头柜、
The West Ridge Forest Farm of Ali River Forestry Bureau has done a few things in promoting the civilization construction of the workforce and improving the working and living conditions of the workers in the front line of production. First, each workforce has built a small bath and solved the difficult issue of bathing Second, improved heating equipment. Small team to the past brick “fire dragon” to iron cast pipe docking “fire dragon”, moving easy to carry, long-term use; Third, the team dorm, each with a removable iron bed , A mat, a bed sheet, a bedside table,