论文部分内容阅读
通过对长江 195 4年型洪水湖口附近地区分洪量变化的多种情况分析研究 ,指出因江湖调蓄容积与江槽泄流能力的改变 ,湖口附近地区分洪量比原规划分洪量增加较多 ,并提出该地区防御 195 4年型洪水的对策建议
Through the analysis and analysis of various changes of flood diversion in the area near the floodplain of the Yangtze River in 1950, it is pointed out that the flood diversion capacity in the vicinity of the Hukou area is larger than that of the original planned flood discharge due to the change of the reservoir volume and the discharge capacity of the riverbed And put forward countermeasures and suggestions for preventing 195 4-year flood in the area