悬移质泥沙测验全断面混合法的探讨

来源 :泥沙研究 | 被引量 : 0次 | 上传用户:twffhvknnh
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、前言 近年来大规模水利建设愈益明显地表明,我国河流泥沙测验资料不全,精度不高,方法繁复,极需改进提高.悬移质泥沙测验精度和效率取决于测验仪器和测验方法,如过去珠江三角洲河口地区的悬移质测验,有六个控制断面,每施测一次全潮输沙率需采取一万多个水样,水样处理工作量庞大,资料计算浩繁,几致使工作无法进行.普通河 I. INTRODUCTION In recent years, large-scale water conservancy construction has become more and more obvious that the information of river sediment test in our country is not complete, the accuracy is not high, the method is complex and it is very much needed to improve and improve.The accuracy and efficiency of suspended sediment test depends on the test equipment and test methods For example, there are six control sections in the suspended sediment test in the estuary area of ​​the Pearl River Delta in the past. When the total tidal sediment transport rate is measured, more than 10,000 water samples need to be taken. The workload of water sample processing is huge. Work can not be done. Ordinary river
其他文献
建立了一种HPLC法 ,用于制剂中盐酸噻氯吡啶和尼群地平的含量测定 ,并就方法的选择性、准确性、精密度、检测限和定量限等对方法进行了认证 .采用C18色谱柱 ,以乙腈 甲醇 醋
肺炎是儿科的常见病和多发病 ,而呼吸道合胞病毒性肺炎占重要地位 ,是北方主要的病毒感染性疾病 ,多伴有喘憋症状 ,尤其是婴儿发病 ,临床治疗困难。我们从 1998年11月~ 1999年
混凝土和钢筋混凝土是水工建设工程,尤其是巨大水工建设工程中最主要的材料。例如,根据美国建筑工程师协会的资料,在世界各地修建的1300个型式不同的拦河坝(坝高在30公尺以
长湖水电厂和回龙山发电厂四台587—450水转机,均更换了转轮叶片和转动臂。为了消除其不平衡重量,自79年起曾先后利用厂家的平衡工具,进行了多次静平衡试验。试验装置如图一
在渠系建筑物中,各种桥梁所占比重很大,故在灌溉工程中占有一定地位。研究分析渠道桥梁的技术经济指标,对合理选择桥型、确定最优方案,讲究经济效果有重要的现实意义。 In
白山水电站已于1982年底顺利下闸蓄水。枢纽布置组成有重力拱坝、右岸地下厂房河床坝身泄洪、右岸明渠底孔导流。本文拟就该工程导流明渠的设计、施工和运行情况作一简单介
一、基本情况马颊河流域南以徒骇河为界,北邻漳卫河、漳卫新河。干流西起河南省濮阳县全提闸,流经河北省大名县和山东省苇县、高唐、临邑,至无棣县黄柏苓附近与德惠新河汇合
A high-rank officer recently emphasized the following major points about the direction of foreign investment utilization in China’s auto industry. 1. Encourag
电影的产生江苏扬州市宝应县城南30公里,是苏北里下河地区,这里河网交错,柳林密布,这个村庄名叫“柳堡”。1943年冬天,胡石言所在的新四军一师三旅七团来到宝应地区开展抗日
补园是两个世界遗产的交融点我的高祖张履谦(1838-1915)是盐商,也是昆曲爱好者。1877年买下拙政园西部的花园和住宅,经营十多年,建成了与昆曲渊源颇深的园宅——补园。我10岁