论文部分内容阅读
双河变电站是湖北华中电网的框扭变电站。目前,引进装设500千伏、750兆伏安变压器一组。怎样管理好目前我国电压等级最高、技术最新、首次投运的大型变电站,是摆在我们面前的一个崭新课题。自1982年元月13日正式投入运行到1986年6月30日,安全运行记录1408天。 一、消化、掌握引进设备是管理引进设备的前提 首先,我们打破对国外进先设备的“神秘感”,要认识它,掌握它,还要改造它。 1.利用基建时机做好培训,做好消化、掌握设备的基础工作。变电站投运之前,我们组织运行人员明确专责分工,参加基建验收。
Shuanghe Substation is a box twist station of Hubei Huazhong Power Grid. At present, a group of 500 kV and 750 megavoltage transformers has been introduced. How to manage the large substations with the highest voltage level, the latest technology, and the first time put into operation in China is a new topic in front of us. Since January 13, 1982, it was formally put into operation until June 30, 1986, and the safety record was 1,408 days. I. Digestion and mastery of imported equipment are prerequisites for the management of imported equipment First, we break the “mystery” of foreign advanced equipment, we must understand it, master it, and reform it. 1. Use infrastructure timing to do a good job of training and do a good job of digesting and mastering the basic work of equipment. Before the transformer substation was put into operation, we organized the operating personnel to make clear division of labor and participate in the acceptance of the infrastructure construction.