论文部分内容阅读
今年,我们201船在局、处党委领导下,深入批林批孔,开展“工业学大庆”群众运动,实行领导干部,工人、技术人员,三结合勇于革新,加大泥泵叶轮直征和出水角,使吹距田原来出厂时的800米增到1610米增加了一倍,挖泥效率由每小时350立方米,提高到390立方米,提高了10%以上。解决了我船在新港施工吹不动和堵管子的关键问题为港口建设做出了我们应有的贡献。
This year, under the leadership of the party committees, our 201 ships have been conducting extensive inspection and approval of bore holes and carrying out masses movements such as “Daqing Industrialization” and the implementation of leading cadres, workers and technicians. They have the courage to innovate in combination with the impetus of mud pump impellers And effluent angle, doubling the distance from 800 meters to 1610 meters at the factory from the original factory was increased from 350 cubic meters per hour to 390 cubic meters, an increase of more than 10%. The key issues that have solved the problem of our vessel being blown up and plugging pipes at Newport have made our due contribution to the construction of the port.