为科学构建上海市海绵城市排水体系,利用虹口港、杨树浦港、走马塘、虬江等水系构建“地下河道”建设深层排水调蓄隧道的可行性,既解决地区46个低标系统排水标准提高至5年一遇并有效应对100年一遇强降雨,又避免大面积翻建现状管线,消除现状积水点,满足内涝防治排水的要求。匡算调蓄规模为98万m~3,一级调蓄隧道全长31.5km,DN8 000,埋深30~60m,二级输送管道全长28.5km,DN4 000,埋深15~25m,三级收集管道:全长23.9km,管径DN3 000,埋深10~15m,末端泵站实现深隧从静态调蓄到动态调蓄的转变,泵站规模200m3/s。
In order to construct Shanghai sponge city drainage system scientifically and make use of Hongkou Port, Yangshupu Port, Zuma River and other rivers to construct “underground river”, it is feasible to construct deep drainage regulation and storage tunnels to solve 46 low standard system drainage The standard was raised to once every five years and effectively dealt with heavy rainfall once every 100 years. It also avoided the need to rebuild the existing pipelines in large areas and eliminate the existing water points to meet the requirements of waterlogging prevention and drainage. The calculation and storage scale is 980,000 m ~ 3. The first-level regulation and storage tunnel is 31.5km in length and DN8,000 with a depth of 30-60m. The second-stage pipeline is 28.5km in length with DN4000 and the depth is 15-25m. Collection pipeline: length of 23.9km, diameter DN3000, depth of 10 ~ 15m, the end of the pump station to achieve deep tunnel from static storage to dynamic storage of change, the pumping station size 200m3 / s.