在黄河三门峡水利枢纽工程施工中,机械化程度比较高。这些机械设备,在工程建设中,发挥了很好的作用。但是,由于过去几年的紧张施工,长期运转,磨损严重,机械设备的技术状况日趋低下。据1963年底统计,机械完好率仅有73.9%。为了保证机械设备具有良好的技术性能,在任何复杂情况下开得动、转得好、过得硬,今年以来,工程局把提高机械完好率作为一项主要工作,开展了五好设备活动,使机械完好率稳
In the construction of Sanmenxia Hydro Project, the mechanization level is relatively high. These mechanical equipment, in construction, has played a very good role. However, due to the tense construction of the past few years, long-term operation and serious wear and tear, the technical condition of machinery and equipment has been declining. According to statistics by the end of 1963, the rate of mechanical integrity was only 73.9%. In order to ensure that machinery and equipment have good technical performance, in any complex situation to move, turn good, flies hard, this year Bureau of Engineering to improve the rate of mechanical integrity as a major work to carry out the activities of the equipment, Make the machine intact rate steady